Bolton School Senior Boys

Initial Construction of the Framework

These photos show the lofting of the frames and the early construction of the Armature.

The lofting board with a main frame set out

boat-lofting-the-frames

The frames hung on the central girder and set with a laser line

boat-hanging-the-frames

The stem bar in place

boat-setting-the-stem